Wexmoor Cargograph · California
Keep your crew building.
Supply as a service. Missing items and late deliveries stop a job, so AI reads every line of your list, people check it, and we date every order to its stage. One supplier for the whole build.
- Built for youA construction materials supplier that plans from your drawings.
- On timeEach order lands the day before the crew needs it.
- One teamOne supplier for the whole build.
Why builders call us
Three things that stop a build.
Each one is fixed before anything is ordered.

01 · Missing items
Every line
A line left off the list stops the crew on site. We read every line before you order.

02 · Late deliveries
$3,449
One idle day, for example: a crew of six waiting, plus a day of interest on a $1M loan. Each order is dated to its stage.

03 · Cash tied up early
On delivery
Finish materials bought at the foundation stage sit for months. You pay as it lands.
One list · one supplier
Every stage, read and dated.
We read your plans, split the whole list by build stage, and date each order to it. No prices on the page: every quote is read against your plans.

Stages 1 and 2
Foundation and frame
Concrete accessories, structural steel, lumber, sheathing, hold-downs and fasteners, cut to your drawings.
Get a quote
Stage 3
Dry-in
Roofing, windows and patio doors, waterproofing, siding and stucco, dated to the dry-in stage.
Get a quote
Stage 5
Finish
Flooring and tile, doors and trim, cabinets, lighting and plumbing fixtures, matched to your finish schedule.
Get a quoteSloped lots
A sloped lot is not a dead lot.
Stepped footings, a cripple wall, and steel where the spans need it. Drawn from our own City-approved plans. We supply every line, each order dated to its stage.
Get a quote
Just-in-time delivery
Stop paying for idle days.
Each order lands the day before its stage, so the crew starts on a full site. You pay as it lands, not months ahead.
Week 1
Foundation
Concrete, rebar, anchor bolts.
Week 3
Frame
Lumber, steel beams, connectors, sheathing.
Week 6
Dry-in
Roofing, windows, wrap.
Week 9
Rough
Electrical, plumbing, heating.
Week 13
Finish
Flooring, doors, cabinets, lighting.
An example schedule. Each date is set only after the supplier confirms it. From our files: Altadena rebuild costs, from county permits.

Wexmoor Power
Power has its own service.
Customized eHouse power distribution centers for commercial and multifamily builds: assessed, configured, built, tested, delivered and started up by one team. Power gear can take months, so it is planned at design.
Stop waiting on materials.
Send your list. Back line by line in 3 business days. Free.
Get in touch We can build it too