Supply · California
Keep your crew building.
Missing items and late deliveries stop a job. We read your list line by line, date every order to its stage, and ship it with warranty.
Why builders call us
Three things that stop a build.
Each one is fixed before anything is ordered.

01 · Missing items
$17,000
A heating system our own takeoff missed. We read every line before you order.

02 · Late deliveries
$3,449
One idle day, for example: a crew of six waiting, plus a day of interest on a $1M loan. Each order is dated to its stage.

03 · Cash tied up early
On delivery
Finish materials bought at the foundation stage sit for months. You pay as it lands.
Our products
One list. One supplier. Every stage.
No prices on the page. Every quote is read against your plans.

Construction materials
Structural steel and connectors
Beams, columns, hangers and hold-downs, cut to your drawings.
View
Construction materials
Framing and lumber
Framing packages, sheathing and engineered wood.
View
Construction materials
Roofing
Class A shingles, underlayment and ember-resistant vents.
View
Construction materials
Commercial roofing
TPO membrane and polyiso insulation for low-slope roofs.
View
Construction materials
Siding, stucco and exterior
Fiber cement, three-coat stucco systems, trim and gutters.
View
Construction materials
Waterproofing
Membranes and coatings, above and below grade.
View
Construction materials
Fasteners and tools
Nails, structural screws and anchors.
View
Interior · Featured
Flooring and tile
Wood-look plank, engineered wood, porcelain floor and wall tile.
View
Interior · Featured
Doors and trim
Prehung interior doors, casing, baseboard and hardware.
View
Interior · Featured
Lighting
Recessed LED, pendants, exterior lights and fans.
View
Interior
Cabinets and vanities
Kitchen cabinets, bath vanities and stone tops.
View
Interior
Windows and patio doors
Fire-zone and energy-rated windows and sliders.
View
Interior
Plumbing fixtures
Faucets, showers, toilets and tankless water heaters.
View
Electrical · Taking specs
Pad-mount transformers
Liquid-filled, for outdoor service.
View
Electrical · Taking specs
Dry-type transformers
Indoor, 600 V and under.
View
Electrical
Panels and switchboards
Service to sub-panel.
View
Electrical
Transfer switches
Backup power and generator hookups.
View
Electrical
Assembled power skids
Gear pre-wired on one frame, shipped as a unit.
ViewSloped lots
A sloped lot is not a dead lot.
Stepped footings, a cripple wall, and steel where the spans need it. Drawn from our own City-approved plans. We supply every line, each order dated to its stage.
Get a quote
Just-in-time delivery
Stop paying for idle days.
Each order lands the day before its stage, so the crew starts on a full site. You pay as it lands, not months ahead.
Week 1
Foundation
Concrete, rebar, anchor bolts.
Week 3
Frame
Lumber, steel beams, connectors, sheathing.
Week 6
Dry-in
Roofing, windows, wrap.
Week 9
Rough
Electrical, plumbing, heating.
Week 13
Finish
Flooring, doors, cabinets, lighting.
An example schedule. Each date is set only after the supplier confirms it.

Power
Don’t let power hold up the build.
Transformers, panels and switchgear for commercial and multifamily builds. Dry-type for indoors, liquid-filled pad-mount outside. Power gear can take months to arrive. Spec it at design, and we date it to your electrical stage.
- Transformers: dry-type and liquid-filled pad-mountTaking specs
- Panels and switchboardsNext
- Transfer switchesNext
- Assembled power skidsNext
