Supply · California

Keep your crew building.

Missing items and late deliveries stop a job. We read your list line by line, date every order to its stage, and ship it with warranty.

Why builders call us

Three things that stop a build.

Each one is fixed before anything is ordered.

A plan sheet with one area circled in red

01 · Missing items

$17,000

A heating system our own takeoff missed. We read every line before you order.

A framing site waiting on an empty delivery spot

02 · Late deliveries

$3,449

One idle day, for example: a crew of six waiting, plus a day of interest on a $1M loan. Each order is dated to its stage.

Finish materials under a tarp on a bare foundation

03 · Cash tied up early

On delivery

Finish materials bought at the foundation stage sit for months. You pay as it lands.

Our products

One list. One supplier. Every stage.

No prices on the page. Every quote is read against your plans.

18 product lines
Structural steel and connectors

Construction materials

Structural steel and connectors

Beams, columns, hangers and hold-downs, cut to your drawings.

View
Framing and lumber

Construction materials

Framing and lumber

Framing packages, sheathing and engineered wood.

View
Roofing

Construction materials

Roofing

Class A shingles, underlayment and ember-resistant vents.

View
Commercial roofing

Construction materials

Commercial roofing

TPO membrane and polyiso insulation for low-slope roofs.

View
Siding, stucco and exterior

Construction materials

Siding, stucco and exterior

Fiber cement, three-coat stucco systems, trim and gutters.

View
Waterproofing

Construction materials

Waterproofing

Membranes and coatings, above and below grade.

View
Fasteners and tools

Construction materials

Fasteners and tools

Nails, structural screws and anchors.

View
Flooring and tile

Interior · Featured

Flooring and tile

Wood-look plank, engineered wood, porcelain floor and wall tile.

View
Doors and trim

Interior · Featured

Doors and trim

Prehung interior doors, casing, baseboard and hardware.

View
Lighting

Interior · Featured

Lighting

Recessed LED, pendants, exterior lights and fans.

View
Cabinets and vanities

Interior

Cabinets and vanities

Kitchen cabinets, bath vanities and stone tops.

View
Windows and patio doors

Interior

Windows and patio doors

Fire-zone and energy-rated windows and sliders.

View
Plumbing fixtures

Interior

Plumbing fixtures

Faucets, showers, toilets and tankless water heaters.

View
Pad-mount transformers

Electrical · Taking specs

Pad-mount transformers

Liquid-filled, for outdoor service.

View
Dry-type transformers

Electrical · Taking specs

Dry-type transformers

Indoor, 600 V and under.

View
Panels and switchboards

Electrical

Panels and switchboards

Service to sub-panel.

View
Transfer switches

Electrical

Transfer switches

Backup power and generator hookups.

View
Assembled power skids

Electrical

Assembled power skids

Gear pre-wired on one frame, shipped as a unit.

View

Sloped lots

A sloped lot is not a dead lot.

Stepped footings, a cripple wall, and steel where the spans need it. Drawn from our own City-approved plans. We supply every line, each order dated to its stage.

Get a quote
Section of our approved two-storey house on a sloped lot
From our City-approved, engineer-stamped plans. Big Bear Lake, CA. Tap a number.

Just-in-time delivery

Stop paying for idle days.

Each order lands the day before its stage, so the crew starts on a full site. You pay as it lands, not months ahead.

Week 1

Foundation

Concrete, rebar, anchor bolts.

Week 3

Frame

Lumber, steel beams, connectors, sheathing.

Week 6

Dry-in

Roofing, windows, wrap.

Week 9

Rough

Electrical, plumbing, heating.

Week 13

Finish

Flooring, doors, cabinets, lighting.

An example schedule. Each date is set only after the supplier confirms it.

A transformer and a panelboard, lit

Power

Don’t let power hold up the build.

Transformers, panels and switchgear for commercial and multifamily builds. Dry-type for indoors, liquid-filled pad-mount outside. Power gear can take months to arrive. Spec it at design, and we date it to your electrical stage.

  • Transformers: dry-type and liquid-filled pad-mountTaking specs
  • Panels and switchboardsNext
  • Transfer switchesNext
  • Assembled power skidsNext

Stop waiting on materials.

Send your list. Back line by line in 3 business days. Free.

Get in touch