Design & Build/ADU cost

ADU cost in Los Angeles, line by line.

Tell us your budget. We'll show you how it builds more, line by line. Have a quote already? Send it, and we read it line by line on day one. Free.

  • Built for youDesign build with a licensed contractor, sized to your lot.
  • On timeYour plans read line by line in 3 business days.
  • One teamDesign, supply and build together.

What sets the cost to build an ADU

Six lines decide it.

Quotes often leave out the lines under the ground. Each one is a line on your estimate, and part of our design and build service. State ADU law sets the fee rules.

  • Design and plansDrawings the city approves, done before anything is ordered.
  • The foundationLow: a flat lot and good soil. Higher: a slope, poor soil or deep footings.
  • The sewer lineLow: a short run to the main line by gravity. Higher: a long run, or a pump.
  • The electrical serviceLow: room on your panel. Higher: a new panel or a bigger service.
  • The kitchen and bathLow: simple fronts and a standard shower. Higher: stone and a curbless shower.
  • Permits and feesPlan check and permits, always. Impact fees only over 750 square feet.

Built on your lot

Solid 2x6 walls, framed by hand.

We frame every ADU on your lot in solid 2x6 wood, with our licensed builder. No factory box, no crane. Every stud, wire and pipe is a line on your estimate.

2x6outside walls, framed on site by a licensed builder, CSLB #1007518.

Backyard ADU in Los Angeles framed on site in 2x6 wood on its own slab, lumber stacked beside it
Illustration: our ADU, framed on its own slab.

Our design

Cook at the island. Talk to your guests.

The cooktop sits on the island, so you cook facing the stools. Behind them the sofa faces a low TV unit with a fire set in it. A fold-down desk by the glass. A mirror wall doubles the light. Every zone has its own lamp.

ADU interior in Los Angeles: island with a flush cooktop facing the sofa, TV unit with a fire, desk by the glass
Illustration of our design: a one-bed ADU of 680 square feet.

Drawn first

Every line starts on a drawing.

A plan, the front, the kitchen wall and a section, drawn before any picture or order. The pictures on this page are built from the same drawing, so what you see is what we price.

Floor plan of a 680 square foot one-bed backyard ADU: island kitchen, sitting area with TV, desk, bath
From our drawing sheet A-101. An illustration, not a permit set.

How it works

Compare ADU construction cost, quote by quote.

  1. Line them upPut each quote in the same six lines. A missing line is a bill you get later.
  2. Find the gapsThe foundation, the sewer, the power and the permits are the usual ones left out.
  3. Send them to usWe read every quote line by line and send back what is missing. Free, on day one.

Projects

ADUs and homes we build.

Built by our general contractor partner, Pacific Prestige Properties, CSLB #1007518. Open any address on the map.

Questions

ADU cost questions, answered.

How much does it cost to build an ADU in LA?

It depends on six lines: the plans, the foundation, the sewer line, the electrical service, the kitchen and bath, and the permits. Send us your budget. On day one we send back a free, line-by-line read of what it builds.

Why does ADU cost so much?

An ADU is a whole small house: a foundation, a roof, a kitchen, a bath, and its own sewer and power. The lines under the ground don't shrink much when the house gets smaller.

What is the most expensive part of building an ADU?

It changes by lot. On a slope or a long lot, the foundation and the sewer line can lead. We read your lot first and show you which line is the biggest.

Is it cheaper to build an ADU or buy a prefab?

Compare whole costs, not box prices. A prefab quote can leave out the foundation, the sewer, the power, the crane and the permits. We frame on your lot in solid 2x6 wood and price every line, so you can compare both.

How to build an ADU cheaply?

Keep the shape simple, keep it at 750 square feet or less so impact fees don't apply, and keep the sewer run short. Spend on what you use every day: the kitchen, the bath and the light.

Can you build an ADU in California?

Yes. State ADU law lets you build one on most lots with a house. If the plans meet the rules, the city has to approve them. You still need a building permit.

Can I pay for an ADU over time?

Yes. Pay in full, or over time. We arrange the loan as a broker, and the lender decides on your file. Loans made or arranged pursuant to a California Financing Law license. NMLS #2841970. Equal Housing Opportunity.

Send your budget or your quote.

Back line by line on day one. Free. Pay in full, or over time.