Completed 2024
New single-family house
2846 Fairmount Ave, La Crescenta, CA
Design & Build/ADU cost
Tell us your budget. We'll show you how it builds more, line by line. Have a quote already? Send it, and we read it line by line on day one. Free.
What sets the cost to build an ADU
Quotes often leave out the lines under the ground. Each one is a line on your estimate, and part of our design and build service. State ADU law sets the fee rules.
Built on your lot
We frame every ADU on your lot in solid 2x6 wood, with our licensed builder. No factory box, no crane. Every stud, wire and pipe is a line on your estimate.
2x6outside walls, framed on site by a licensed builder, CSLB #1007518.

Our design
The cooktop sits on the island, so you cook facing the stools. Behind them the sofa faces a low TV unit with a fire set in it. A fold-down desk by the glass. A mirror wall doubles the light. Every zone has its own lamp.

Drawn first
A plan, the front, the kitchen wall and a section, drawn before any picture or order. The pictures on this page are built from the same drawing, so what you see is what we price.

How it works
Projects
Built by our general contractor partner, Pacific Prestige Properties, CSLB #1007518. Open any address on the map.
Completed 2024
2846 Fairmount Ave, La Crescenta, CA
Completed 2025
7304 Summitrose St, Tujunga, CA
Completed 2025
360 E 42nd Pl, Los Angeles, CA
Completed 2025
3784 Pine Needle Dr, Duluth, GA
In progress 2026
7304 Summitrose St, Tujunga, CA
In progress 2026
312 N Beachwood Dr, Burbank, CA
In progress 2026
2811 Olive Ave, Altadena, CA
Permit ready 2026
42994 Falls Ave, Big Bear Lake, CA
Questions
It depends on six lines: the plans, the foundation, the sewer line, the electrical service, the kitchen and bath, and the permits. Send us your budget. On day one we send back a free, line-by-line read of what it builds.
An ADU is a whole small house: a foundation, a roof, a kitchen, a bath, and its own sewer and power. The lines under the ground don't shrink much when the house gets smaller.
It changes by lot. On a slope or a long lot, the foundation and the sewer line can lead. We read your lot first and show you which line is the biggest.
Compare whole costs, not box prices. A prefab quote can leave out the foundation, the sewer, the power, the crane and the permits. We frame on your lot in solid 2x6 wood and price every line, so you can compare both.
Keep the shape simple, keep it at 750 square feet or less so impact fees don't apply, and keep the sewer run short. Spend on what you use every day: the kitchen, the bath and the light.
Yes. State ADU law lets you build one on most lots with a house. If the plans meet the rules, the city has to approve them. You still need a building permit.
Yes. Pay in full, or over time. We arrange the loan as a broker, and the lender decides on your file. Loans made or arranged pursuant to a California Financing Law license. NMLS #2841970. Equal Housing Opportunity.
Back line by line on day one. Free. Pay in full, or over time.