Construction estimating services CaliforniaSame house. Smarter picks.
Our construction estimating services in California count every line of your plans, find what's missing, and pick code-legal options for your lot. First read free, back in 3 business days.

A Los Angeles apartment building with a diamond facade, as it stands today
Most estimates miss lines, and you pay for them on site.
A takeoff built on guesses leaves items out. Then the change orders start, and the budget breaks halfway through the build.
We count every line, then pick the best value for each one.
Finding missing items mid-build is the most expensive way to find them. We read your plans against the drawings and the code for your lot, then fix it on paper.
How we're different
Every line counted and checked by a person, with picks that pass for your city and your fire zone.
Why our price holds
What's missing gets fixed before anything is ordered, so it doesn't turn into a change order.
Why it lasts
Every plan set adds to our record of what each California city asks for. Your next estimate is faster.
Send the plan set.
Plans, a list or a budget.
Get the first read, free.
What's missing and what breaks code, back in 3 business days.
Get the full package.
The takeoff, code-legal picks, the build method and dated orders.
What the design package covers.
Construction takeoff
Every line counted from your plans: materials, sizes and quantities.
What's missing
Items the plans need but the list left out, found before you order.
Code-legal options
Picks that pass for your lot, your city and your fire zone.
Build method
The order of work, stage by stage, from footing to finish.
Stage dates
Each order dated to its build stage once the supplier confirms it.
One supplier
Every line can be ordered through Wexmoor, delivered when the stage needs it.
The first read is free and comes back in 3 business days. The full package comes after it.
Buildings like these, as they stand.
Older buildings across Los Angeles. A careful read of the plans decides what each one costs to change.


Every line missing from the estimate becomes a change order on site.
Send the plan set. Get the first read, free.
Send the plan setWe read the file before you pay for it.
Questions owners and builders ask
What are construction estimating services?
Someone counts every material and task on your plans and prices them, so you know the cost before you build.
What is a construction takeoff?
The list of every material on the plans, with sizes and quantities, counted line by line.
How long does a first read take?
3 business days from the plans, free.
Do you check the code?
Yes. Every pick has to pass for your lot, your city and your fire zone.
Can you supply the materials too?
Yes. Every line can be ordered through Wexmoor, each order dated to its build stage.
Written by Irakli Ezugbaia, CA DRE #02271654.
More on design and build
Part of the real estate deal engine by Wexmoor Circle.
Photos: Downtowngal, CC BY-SA 4.0, Wikimedia Commons, color graded; Downtowngal, CC BY-SA 4.0, Wikimedia Commons, color graded; Downtowngal, CC BY-SA 4.0, Wikimedia Commons, color graded.